Waiting for the floor

Waiting for the floor
Waiting for the floor
03 November 2023 - 0 Comments
Posted by Katie Farnell
We delayed doing the floor as we came up with an idea to improve the floor to wall space.  We have a Builder coming tomorrow to discuss further. 

Whilst waiting for the builder  adding the fixture and fittings have Commenced. As a food establishment we need certain areas that arent accessable whilst making cheese. We decided to use a stair gate to seperate the area. The PPE holders will go on the wall next. to it. 



We need a little fridge/Freezer to keep Starter culture and rennet seperate from the cheese. Rob built a cupboard  under the unit. Still deciding what to use this space  above for and how we will adapt it but the fridge is out the way underneath. A bit of water spilt on the floor from fridge but the floors  still to be cleaned further and acid etched so not a problem.

Leave a reply
Optional, for replies


Register to earnLoyalty Points
Loyalty Program
Join our VIP rewards program today!
Register to earn Loyalty Points
Points mean prizes!
Ways to earn
Welcome gift
Place an order
Write a review
Newsletter signup
Ways to redeem
% discount!
Join today
Already have an account?Sign in
Withdraw from contract